KOC has commissioned SPETCO to design, build, test, commission, operate & maintain Gas Compression Package (GCP) near GC-28 at TP-4 using the gas from GC 16 & 28 and Gas Re-Injection Package (GRIP) near wells MN 129 & MN 140. The project is intended to increase the gas export capability and reduce the gas and condensate flaring in the Gathering Center 16 (GC-16), in line with the Kuwait Oil Company’s objective of achieving zero flaring.
Design, Engineering, Supply, Installation, Commissioning, Operations and Maintenance of Gas Compression Package (GCP) near GC-28 at TP-4 using the gas from GC 16 & 28 and Gas Re-Injection Package (GRIP) near wells MN 129 & MN 140.
Detailed engineering of the GCP & GRIP and all associated facilities. Equipment Fabrication & Manufacturing Site Construction & commissioning of GCP & GRIP & related facilities. Operate the GCP & GRIP to deliver the gas to specifications required by KOC. Maintenance of GCP & GRIP
TV (compressor – 1no.) - 6 MMSCFD
GCP (4 nos. compressors) - 40 MMSCFD
GRIP (4 nos. compressors) - 60 MMSCFD for Gas re-injection
Interconnecting pipelines total of 16 main lines
Achieved more than 1 Million manhours (1,154,263) with ZERO Loss Time Injury (LTI)
Targeted KPIs achieved successfully
Overall HSE Training Achieved to 75% as per Training Matrix which includes Third party training by competent trainer: H2S hazards, First Aid, Defensive driving and Commentary driving
Project Employees actively participated in Monthly Safety quiz competitions and SOS card reporting system and received awards from the Management.
Project drivers received Best Driving Attitude (BDA) as per IVMS data.