Kuwait Oil Company (KOC) commissioned SPETCO to design, construct, commission, operate and maintain the Gas Processing Facility located in Western Kuwait. This project is intended to reduce the flaring of the gas and condensates in the KOC West Kuwait operations, one of the major milestones in achieving KOC’s objective of zero flaring. The construction of GSF was completed in July 2010 and it was commissioned in August 2010 and is still being operated & maintained by SPETCO.
Product gas is exported into the existing 20”pipeline, the pressure at the destination (S Manifold) being 220 psig. At 60 MMSCFD feed rate the expected pressure at the GSF battery limit is approximately 270 PSIG. Facility diverts the export gas to the FG network (24” FG line) also provided with a back flow arrangement to the FG tie-in point.
lb H2O / MMSCF Maximum
% CO2 Maximum
PPMv H2S Maximum